Task #14
open
- Due date set to 05/31/2023
- Project changed from 8 to Systems_Integration
- Status changed from New to New
- % Done changed from 0 to 0
- Assignee set to George Washington
Assigned to george for new sprint.
- Status changed from New to ToDo
- % Done changed from 0 to 0
- Assignee changed from George Washington to George Washington
- Status changed from ToDo to In Progress
- % Done changed from 0 to 0
- Assignee changed from George Washington to George Washington
- Priority changed from Normal to Immediate
- Status changed from In Progress to Blocked
- % Done changed from 100 to 100
- Assignee changed from George Washington to George Washington
Not hearing back from IT. Asked for status update.
Also available in: Atom
PDF